If you're interested in becoming a VMware vRealize Operations Specialist, you will need to pass the 5V0-35.21 exam. This exam is designed to test your skills and abilities in installing, configuring, and managing a VMware vRealize Operations environment. Passcert has recently cracked the VMware vRealize Operations Specialist 5V0-35.21 Dumps which are designed to help you identify areas where you need additional study and to reinforce the concepts that will be tested on the exam. By using Passcert VMware vRealize Operations Specialist 5V0-35.21 Dumps, you can maximize your chances of passing the exam and earning the VMware Certified Specialist – vRealize Operations badge.

VMware Ceritifcation 5V0-35.21 Exam Details
Exam 5V0-35.21 : VMware vRealize Operations Specialist
Language: English
Number of Questions: 76
Format: Single and Multiple Choice, Proctored
Passing Score: 300 (100-500)
Duration: 135 Minutes
Passing Score: 300 (scaled)
Pricing: $250 USD
Associated Certification: VMware vRealize Operations - Cloud Management Automation 2023, VMware Certified Specialist - vRealize Operations 2023
VMware vRealize Operations Specialist 5V0-35.21 Exam Sections
Section 1 – Introduction
Section 2- Introduction to vRealize Operations
Section 3 - vRealize Operations Architecture
Section 4 - Deploying vRealize Operations
Section 5 - vRealize Operations Concepts
Section 6 - vRealize Operations Policies and Certificates Management
Section 7 - Capacity Optimization
Section 8- Performance Optimization
Section 9 - Troubleshooting and Managing Configuration Pillars
Section 10 - Application Monitoring in vRealize Operations
Section 11 - Custom Alert Definitions
Section 12 - Custom Views and Reports
Section 13 - Custom Dashboards
Section 14 - Super Metrics
Section 15 - User Access Control
Section 16 - Extending and Managing a vRealize Operations Deployment Objective: 16.1: Identify characteristics of a management pack.
Section 17 - vRealize Operations Cloud Overview
Share VMware vRealize Operations Specialist 5V0-35.21 Free Dumps
An administrator is using the troubleshooting workbench in vRealize Operations for troubleshooting purposes.
Which other vRealize Suite product's data will be shown in this view when the integration is configured?
A.vRealize Log Insight
B.vRealize Network Insight
C.vRealize Automation
D.vRealize AI Cloud
Answer: B
Due to multiple hardware failures, several virtual machines were corrupted and are being restored from a recent backup. One of the corrupted virtual machines was the primary replica node of a large production vRealize Operations Manager cluster.
How should the system administrator resolve this availability issue within vRealize Operations Manager?
A.Remove the corrupted node, and then disable and re-enable vRealize Operations Manager High Availability to reassign the primary replica role to another existing node in the cluster.
B.Deploy a new vRealize Operations Manager node, and then add it to the existing cluster.
C.Clone an existing primary vRealize Operations Manager node, and then add it into the vRealize Operations Manager cluster.
D.Ask the backup administrator to restore the corrupted primary replica node, and then refresh the nodes from the vRealize Operations Manager administrator interface.
Answer: A
Which two pricing card types are available in vRealize Operations? (Choose two.)
A.Cost-based
B.Static-based
C.Rate-based
D.Allocation-based
E.Demand-based
Answer: A, D
An administrator is working on a non-credential based service discovery in a virtualization environment using vRealize Operations.
Which package is a base requirement of the virtual machine?
A.Telegraf Agent
B..NET
C.Remote Collector
D.VMware Tools
Answer: D
Which actions can be performed on vSphere virtual machine from vRealize Operations Product UI? (Choose three.)
A.Create virtual machine snapshot
B.Delete virtual machine snapshot
C.Move virtual machine
D.Add virtual disk
E.Expand virtual disk
F.Add vCPU
Answer: A, B, E
Which two statements accurately characterize reports in vRealize Operations? (Choose two.)
A.Views and Dashboards are the only data types available for a report.
B.Only PDF type reports can be used to schedule a report generation.
C.A report layout can contain table of contents, cover page, and footer.
D.Scheduling of reports can be done hourly, daily, weekly, and monthly.
E.Reports scheduled for generation can only be shared out via email.
Answer: C, D
Which type of node in a vRealize Operations (vROps) design allows an administrator to scale out vROps to monitor very large environments?
A.Remote collectors
B.Replica Primary nodes
C.Primary nodes
D.Data nodes
Answer: A
An administrator is using vRealize Operations to optimize capacity within a vSphere Datacenter. The administrator will use the main categories for reclamation that are shown under the Reclaim view on the Home Screen navigation.
Which three main categories are available to the administrator in this view? (Choose three.)
A.Unused Datastores
B.Orphaned Disks
C.Snapshots
D.Powered Off VMs
E.VM Disks utilized %10 or less
F.Unused Hosts
Answer: A, B, E